Fee Structure

Introduction

The Fee Structure masters list contains the fee details applicable for processing specific services. All fee-related information collected by the authorities during the course of building plan approval is maintained in this masters.

Data Table

Sr No.Service Type*Application Type*Application SubtypeFee Subtype*BPA Fees*Amount*Calculation Logic

1

new construction

PERMIT APPLICATION

application fee

Application Fees

50

2

new construction

PERMIT APPLICATION

Medium Risk

sanction fee

Additional Fees

0

3

new construction

PERMIT APPLICATION

Low Risk

application fee

Land Development Charges

50

4

new construction

OCCUPANCY CERTIFICATE

High Risk

sanction fee

Charges for Well

50

The data given in the table is sample data for reference.

Procedure

Data Definition

Sr. No.Column NameData TypeData SizeIs Mandatory?Description

1

Service type

Text

256

Yes

The type of OBPS service for which the fees is to be collected. Refer to the Data Table above for illustration

2

Application Type

Text

256

Yes

List of application types for which the fees are to be calculated. Refer to the Data Table above for illustration

3

Application Subtype

Text

56

No

Application subtype is mentioned here such as type of risk

4

Fee Subtype

Text

256

Yes

Type of fees so collected to be mentioned here. Refer to the Data Table above for illustration

5

BPA Fee

Text

56

Yes

The type of OBPS service for which the fees is to be collected. Refer to the Data Table above for illustration

6

Amount

Integer

6

Yes

Fee Amount collected is mentioned here. Refer to the Data Table above for illustration

7

Calculation Logic

Text

1024

No

Fees calculation logic if any is mentioned here

Steps to fill data

  1. Download the data template attached to this page.

  2. Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.

  3. Reach out to the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.

  4. Identify the combination of attributes for with the fee is defined and then fill into the given template.

  5. Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.

Checklist

The checklist is a set of activities to be performed once the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.Checklist ParameterExample

1

Make sure that each and every point in this reference list has been taken care of

Checklist

Entity Specific Checklist

There is no separate entity-specific checklist for this entity.

Attachments

​All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.