Town Planning Schemes

Introduction

Town Planning Schemes masters list contains all building plan approval schemes and sub-schemes available for the benefits of the citizens. Create a list of the available schemes and map these schemes to specific Occupancy Types.

Data Table

Sr. No.CodeSub Scheme*Scheme*Occupancy Code*Occupancy Name

1

SCM1

Sub scheme 1 for Ward No. 1

DTP Scheme for Ward No. 1

R1

Residential

2

SCM2

Sub scheme 2 for Ward No. 1

DTP Scheme for Ward No. 1

C1

Commercial

3

SCM3

Sub scheme 1 for Ward No. 7

DTP Scheme for Ward No. 7

C1

Commercial

Data given in the table is sample data for reference.

Procedure

Data Definition

Sr. No.Column NameData TypeData SizeIs Mandatory?Description

1

Code

Alphanumeric

64

Yes

Unique code to record

2

Sub scheme

Text

256

Yes

Sub scheme name

3

Scheme

Text

256

Yes

Name of the schemes available at a ULB/state level

4

Occupancy Code

Alphanumeric

64

Yes

Occupancy code - Refer to Building Occupancy to know more about it

5

Occupancy Name

Text

64

No

Name provided for occupancy in Building Occupancy

Steps to fill data

  1. Download the data template attached to this page.

  2. Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.

  3. Reach out to the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.

  4. Identify all the scheme and sub-schemes and fill into the given template.

  5. Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.

Checklist

The checklist is a set of activities to be performed once the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.Checklist ParameterExample

1

Make sure that each and every point in this reference list has been taken care of

Checklist

Entity Specific Checklist

There is no separate entity-specific checklist for this entity.

Attachments

​All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.